Login
Book a demo

GAWB landscape_2

How Gladstone Area Water Board transformed their water management efficiency

100%

Duplicate documents eliminated

95%

Reduction in searching data

Overview

Gladstone Area Water Board (GAWB) manages a broad network of assets including delivery pipelines, water treatment plants and other bulk water distribution infrastructure.

An audit of GAWB’s Document Management System found that works were being performed with outdated information. Additionally, asset data and drawings were difficult to find.

Discover how they worked with RedEye to resolve these challenges, and ultimately reduce risk, error and miscommunication, while improving safety and compliance.

Key Takeaways

  • Using up-to-date engineering drawings can generate substantial time and cost savings on upgrade projects by eliminating re-drafting.

  • Creating a single source of truth of asset data and drawings ensures field teams and contractors can work smarter and more safely.

  • Digital transformation does not necessarily have to eliminate head count but can improve productivity of existing experts within an organisation.

“RedEye has provided support and advice above expectations."

Tina Underwood
Technical Officer – GIS, Gladstone Area Water Board

GAWB Water Supply 4 - website (1)

Challenges

The Gladstone Area Water Board (GAWB) was established in 1973 as a Project Board under State and Regional Planning and Development, Public Works Organisation and Environmental Control Act 1971-73.

GAWB’s purpose is to deliver the water needs of its current and future customers in Central Queensland’s Gladstone region, in environmentally, socially and commercially sustainable ways.

As well as owning and operating the Awoonga Dam and a recreational fishery on the Boyne River, GAWB manages a network of delivery pipelines, water treatment plants and other bulk water distribution infrastructure.

An audit of GAWB’s Document Management System revealed that works were being performed with outdated information. GAWB’s teams also reported that asset data and drawings were difficult to find. This raised a number of issues and risks pertaining to project delays, general inefficiencies, contractual litigation, and even safety.

GAWB sought a new DMS solution that would help the organisation work smarter, reduce risk, and save money.

Solution

GAWB’s new ecosystem, which included RedEye DMS and other applications such as Microsoft365 and GIS, went live in July 2020 amid the COVID-19 pandemic.

It connected users in many functional areas across the organisation, while also supporting more than 37 contractors to access critical asset drawings and data.

One of the key mandates of the upgrade project was not to replace practices and people, but rather to enhance existing practices with technology, freeing up staff to do higher value work.

The project vision was to improve services through a collaboration environment to better support the network operators and projects teams to make their job easier by providing access to information with out limitations.

The project also sought to add employee value to the business, customers, and industry through training and up-skilling with current technology skill sets and to draw maximum value from the assets.

“Moving to remote delivery mid-implementation project due to COVID-19, RedEye maintained support and advice above expectations, ensuring delivery was on schedule. RedEye always communicates in a timely manner and is available, which helps us minimise concerns and risks with the shift of delivery method.”

Tina Underwood
Technical Officer – GIS, Gladstone Area Water Board

GAWB Bro Cvr Sml-01-website (1)

Outcomes

Using RedEye, GAWB was able to reduce duplicate documents by 100%. The new system immediately enabled faster document upload times, delivered a simple search function to find information faster, allowed users to manage redline markups, and introduced a version control function.

Along with the launch, came new policies and business processes. GAWB’s policy now is to manage all drawings and PDF plots related to their capital project delivery and operations and maintenance in RedEye. This has created a single source of truth for all asset-related drawings and information.

Internally, GAWB’s project management team are some of the most active users of RedEye as they control the approvals of as-constructed drawings submitted by their contractors. This process creates accurate baseline data about the assets out in the field.

It also ensures the increased safety of field teams, by providing them access to the most current drawings.

RedEye DMS has provided a single source of truth for engineering data and drawings, inviting users into a common data environment to view, markup, and share data replacing repetitive manual tasks saving time and freeing up resources.

The technology platform has enabled the business to enhance its processes making it easy to control process, track and audit, change control and to improve stakeholder engagement both internally and externally providing new business opportunities.

GAWB’s Engineering team noted the importance of maintaining drawings accurately throughout the lifecycle of the asset - and the cost of not doing so.

They reported how in the past, having inaccurate drawings could add significant costs to future projects by having to field verify undocumented modifications. RedEye has helped solve this challenge.

When it comes time for upgrades or necessary changes, reusing the past designs of project drawings now also creates cost savings for GAWB. By not having to re-create drawings, the project team does not incur the cost of field verifications, re-drawing and engineering time.

By making asset data and engineering drawings accessible anywhere, any time, RedEye assists water utility providers like GAWB to ultimately reduce risk, error and miscommunication, improving safety and compliance.

 

“Without systems like RedEye, GAWB could not live up to its Vision, Mission and Values to safely and effectively operate and maintain infrastructure to deliver “Quality Water”. It is without doubt that the benefits to the business, has a positive rippling effect on the wider organisation, and the community.”

Tina Underwood
Technical Officer – GIS, Gladstone Area Water Board

GAWB Water Supply 5 - website (1)

About RedEye

At RedEye, we prioritise our customers above all else. Choosing us means forging a partnership with our talented team members around the world. This relationship shapes our collaborative efforts and defines our shared journey. Today, RedEye operates from three global offices, assisting clients in managing over $450 billion worth of large, complex assets and critical infrastructure.

We launched in Australia in 2012, in response to a widespread business challenge across various industries - the democratisation of engineering drawings and documents. Our aim was to provide staff and contractors with easy access to current and accurate information.

Driven by our vision to create a global hub for engineering drawings we developed a Software-as-a-Service (SaaS) solution, specifically designed to securely store, share, markup, and manage engineering drawings and documents from both desktop and mobile platforms.

Supporting a wide variety of files including CAD, and integrating with core business systems like ERP, EAM, and GIS, RedEye enhances the utility of existing technology stacks to empower both creators and consumers of engineering drawings to work more effectively.

“RedEye’s team and partners have developed deep domain and subject matter expertise working with numerous asset owners and critical infrastructure operators and are available to share best practice solutions, knowledge and processes.”

Randall Makin
Co-Founder & CEO, RedEye

 

Trusted engineering information management platform for $450 billion worth of assets worldwide

  • Alinta Energy
  • Aurora Energy
  • Bengal Energy
  • BMA BHP Mitsubishi Alliance
  • Cleanco Qld Logo
  • Coronado Curragh
  • El Paso Electric
  • Genesis-Portrait-Logo-Full-Colour
  • Gladstone Area Board GAWB
  • Gladstone Regional Council
  • Las Vegas Valley Water District
  • Melbourne Water
  • Metro North Hospital and Health Service
  • New Plymouth District Council Landscape Logo Full Colour
  • OK Tedi Mining
  • Powernet full colour
  • Qld Childrens Hospital
  • Rous-County-Council-Portrait-Logo-Full-Colour
  • SA Power Networks
  • Senex
  • Snowy Hydro
  • Southern Nevada Water Authority
  • SSR Mining
  • Sunshine Coast Hospital and Health Service
  • TECO
  • Transpower
  • Transurban logo
  • UrbanUtilities
  • Veolia
  • WestSide
  • Whitehaven
  • Yarra Valley
  • Alinta Energy
  • Aurora Energy
  • Bengal Energy
  • BMA BHP Mitsubishi Alliance
  • Cleanco Qld Logo
  • Coronado Curragh
  • El Paso Electric
  • Genesis-Portrait-Logo-Full-Colour
  • Gladstone Area Board GAWB
  • Gladstone Regional Council
  • Las Vegas Valley Water District
  • Melbourne Water
  • Metro North Hospital and Health Service
  • New Plymouth District Council Landscape Logo Full Colour
  • OK Tedi Mining
  • Powernet full colour
  • Qld Childrens Hospital
  • Rous-County-Council-Portrait-Logo-Full-Colour
  • SA Power Networks
  • Senex
  • Snowy Hydro
  • Southern Nevada Water Authority
  • SSR Mining
  • Sunshine Coast Hospital and Health Service
  • TECO
  • Transpower
  • Transurban logo
  • UrbanUtilities
  • Veolia
  • WestSide
  • Whitehaven
  • Yarra Valley

Book a demo

C 12